Schedule(s) in a Presentation

  • 1
  • Question
  • Updated 2 years ago
  • Answered
Is there a way to use a placeholder to play an existing schedule? I'm trying to build a dashboard design and would like a schedule to play inside of the presentation while static content is pinned on the left and bottom. This design is similar to The Weather Channels design where they have content on the left and bottom while they have their demonstrations / video in the middle.
Photo of Shankar Dandapat

Shankar Dandapat

  • 70 Points

Posted 2 years ago

  • 1
Photo of Ghislaine Guerin

Ghislaine Guerin

  • 116 Points 100 badge 2x thumb
Hi Shankar,
We don't support a schedule to play within a placeholder, but you can manage the timeline settings of a placeholder's playlist item to achieve the same results. 

Photo of Darius - PRODO.us

Darius - PRODO.us, Champion

  • 26,850 Points 20k badge 2x thumb
Shankar, technically you still can do that; although, it is not supported. All you need to do is use the schedule preview link and pull it to your presentation with the Web Page Widget.